Rooftop Solar for MSMEs in Andhra Pradesh (2026): Net Metering, Behind the Meter or Open Access?
Net metering, behind the meter with zero export, or open access: how Andhra Pradesh MSMEs can choose a rooftop solar route under the 2026 APERC rules.

Quick answer: An MSME in Andhra Pradesh has three main ways to put solar on its own roof in 2026. Net metering under APERC Regulation 4 of 2023 suits plants from 1 to 500 kW (capped at your contracted load) where some power will flow back to the grid. Behind the meter with zero export, eased by APERC practice directions reported in August 2026, needs no prior DISCOM permission, only prior intimation, and attracts no cross subsidy or additional surcharge, as long as nothing is injected into the grid. Green energy open access becomes an option from 100 kW of contracted demand when the roof is too small. Tariffs for FY 2026-27 are unchanged, so the saving still comes down to how many of your own units the plant replaces.
For a factory owner in Visakhapatnam, Vijayawada, Nellore or Tirupati, the question is no longer whether solar works, but which connection route fits the plant's load, roof and working hours. This guide sets out the options as of November 2026.
What changed for AP businesses in 2026
- No tariff hike for FY 2026-27. In March 2026 APERC retained the existing LT and HT tariffs and structure for all categories, and the state government is bearing a revenue gap of Rs 15,790.57 crore (Deccan Chronicle, Mercom). APERC also rejected DISCOM proposals on time-of-day tariffs and rooftop solar billing norms, and raised the load limit for the concessional cottage and small industries tariff from 10 HP to 20 HP.
- Behind-the-meter solar made simpler. APERC practice directions reported on 19 to 21 August 2026 (SolarQuarter, Energetica, Mercom) say captive rooftop plants connected to the consumer's internal bus bar need no prior permission, feasibility approval or line clearance from the DISCOM.
- Net metering rules updated. Regulation 4 of 2023 was amended by Regulation 10 of 2025 (order of 4 December 2025), and from February 2026 settlement is monthly, with surplus paid at the APERC feed-in tariff by bank transfer.
- Older plants protected. In June 2026 APERC clarified that rooftop projects of 500 kW to 1,000 kW commissioned before the 2023 regulations can continue under net or gross metering (Mercom, 5 June 2026).
The three routes side by side
| Net metering | Behind the meter, zero export | Green energy open access | |
|---|---|---|---|
| Where the plant sits | Your roof | Your roof or premises, on the internal bus bar | A solar park or another site |
| Size | 1 to 500 kW, capped at contracted load | Sized to your daytime load so nothing is exported | From 100 kW contracted demand (Green Energy Open Access Rules, 2022) |
| DISCOM approval | Application, feasibility and net meter agreement | No prior permission; prior intimation with capacity and single line diagram | Open access application and agreements |
| Surplus power | Settled monthly at the APERC feed-in tariff | Not allowed; zero injection at all times | Banking and settlement per open access rules |
| Cross subsidy and additional surcharge | Not part of net metering billing | Do not apply, including third-party financed plants | Apply as per APERC open access rules |
| Best for | Units that run fewer shifts or close on Sundays | Continuous day loads: process lines, cold storage, compressors | Large loads with little roof |
Route 1: net metering
Your plant offsets your own units, and any monthly surplus is paid at the APERC feed-in tariff. For industrial consumers, two limits matter: the 500 kW ceiling and the cap at your contracted load. That ceiling is why the AP Chambers of Commerce asked in March 2026 for the cap to be raised from 500 kW to at least 1,000 kW, saying it would help MSMEs lower operating costs (The Hans India). Until the rules change, 500 kW is the limit for new net metered plants. Our AP net metering guide covers the application steps, fees and timelines for APSPDCL, APEPDCL and APCPDCL.
Route 2: behind the meter with zero export
This is the route the August 2026 directions opened up. As reported, the plant connects to your internal bus bar and the main conditions are:
- Prior intimation to the DISCOM before you synchronise or island the plant, with technical details such as installed capacity and the single line diagram. Connecting without notice can attract penalties under Sections 142 and 146 of the Electricity Act, 2003.
- Zero injection into the grid at all times while synchronised, whether the grid is live or off. In practice this means export limiting controls and careful sizing against your lowest daytime load.
- Multiple interconnections and inverter set-ups are allowed if safety standards are met, with inverter data shared with the DISCOM or SLDC where required.
- No cross subsidy surcharge or additional surcharge, including for third-party financed plants under Regulation 4 of 2023. You still pay the regulated tariff charges, and DISCOMs may seek service charges in future tariff filings.
For a plant that runs through the day, every unit generated displaces a grid unit. The trade-off: on holidays, generation above your load is curtailed, not credited.
Route 3: open access when the roof is not enough
If your load is large and your roof small, the Green Energy Open Access Rules, 2022 let consumers with 100 kW or more of contracted demand buy green power from a plant elsewhere. Get a landed cost per unit before comparing it with rooftop.
Estimating what a rooftop plant is worth
Start with units, not prices. CSE India puts typical output at 4 to 5 units per kWp a day, and a published PVsyst study of a 1 MWp plant in Visakhapatnam modelled about 1,679 units per kWp a year (Frontiers in Energy Research, 2022).
| Plant size | Units a year (at about 1,500 to 1,700 per kWp) | Value for every Rs 1 of your tariff |
|---|---|---|
| 50 kWp | About 75,000 to 85,000 | About Rs 75,000 to Rs 85,000 |
| 100 kWp | About 1.5 to 1.7 lakh | About Rs 1.5 to 1.7 lakh |
| 300 kWp | About 4.5 to 5.1 lakh | About Rs 4.5 to 5.1 lakh |
| 500 kWp | About 7.5 to 8.5 lakh | About Rs 7.5 to 8.5 lakh |
Multiply the last column by the energy charge on your own bill to see the yearly value. Then check three things that shift the answer: how much of the output you use during working hours, how clean the modules are kept (see our O&M and string monitoring guide), and how you fund the plant (our CAPEX vs OPEX vs PPA guide compares the options).
Costs and incentives to check
- GST on solar devices is 5% from 22 September 2025, down from 12%.
- Module sourcing rules. ALMM requirements affect which modules, and soon which cells, a project can use. See our ALMM List-II guide.
- AP MSME and Entrepreneur Development Policy 4.0 (2024-29). The policy lists incentives such as fixed power cost reimbursement and reimbursement of energy and water audit costs for eligible manufacturing units. Amounts and conditions are set in the operational guidelines, so confirm with the District Industries Centre whether your unit qualifies.
- Depreciation. The Income-tax Act, 2025 applies from 1 April 2026; confirm the current solar depreciation rate with your chartered accountant.
Frequently asked questions
Can my factory install more than 500 kW on the roof?
Not under net metering for a new plant, as the cap stands today. A larger plant may be possible behind the meter with zero export, subject to your DISCOM's technical conditions (the reports on the August directions mention no size cap), or you can combine rooftop with open access.
Do I need DISCOM permission for a behind-the-meter plant?
According to the August 2026 directions, no prior permission, feasibility approval or line clearance is needed, but prior intimation with technical details is mandatory. Your EPC partner should also confirm which electrical safety approvals apply to your plant size.
Is there a central subsidy for MSME rooftop solar?
PM Surya Ghar central financial assistance is for residential rooftops and housing societies, not factories. Business benefits come mainly from bill savings, the 5% GST rate, depreciation and any state incentive your unit qualifies for.
Rules can be revised. This guide is current as of November 2026; check the latest APERC regulations, practice directions and your DISCOM's procedures before you invest.
Planning solar for your unit in Andhra Pradesh?
Greentek has worked in solar from Secunderabad since 1997, including industrial rooftops in Andhra Pradesh. If you would like help reading your load profile and choosing between net metering, behind the meter and open access, our team is happy to talk it through.
About the Author
About Greentek
Get a Free Solar Quote
A Greentek engineer will call you within 24 hours.
Need Solar Solutions?
Interested in learning more about our solar energy solutions? Get in touch with our experts.
Get Free Consultation