Telangana Time of Day Tariffs (FY 2026-27) and Solar: Use the Daytime Rebate, Avoid the Peak

Telangana HT bills carry a Rs 1.50 peak surcharge and a Rs 0.50 daytime rebate in FY 2026-27. What it means for rooftop solar and how to shift loads into solar hours.

Telangana Time of Day Tariffs (FY 2026-27) and Solar: Use the Daytime Rebate, Avoid the Peak
Quick answer: In Telangana, Time of Day (ToD) billing for FY 2026-27 applies to listed HT categories, including HT-I(A) industry and HT-II(A) commercial. Power used from 6 to 10 am and 6 to 10 pm costs Rs 1.50 a unit more than the normal energy charge, power used from 10 am to 6 pm costs Rs 0.50 a unit less, and the night slot is billed at the normal rate. That is a gap of Rs 2.00 a unit between the peak and daytime slots. A rooftop solar plant produces almost all its output inside the cheaper daytime window, so the biggest gains come from moving flexible loads out of the peak and into solar hours.

Many factory owners in Telangana see the ToD lines on their HT bill but rarely act on them. This guide explains what the FY 2026-27 schedule says, who it applies to, what changed in the last year, and how to use solar and load shifting together.

The ToD slots for FY 2026-27

The Retail Supply Tariff schedule for FY 2026-27, published by TGSPDCL and applicable from 1 April 2026 to 31 March 2027 for TGSPDCL, TGNPDCL and the Sircilla cooperative society, sets three time slots. The adjustment is applied to the retail energy charge of your category and voltage.

Time slotAdjustment to the energy chargeHow rooftop solar fits
6:00 to 10:00 and 18:00 to 22:00 (peak)Plus Rs 1.50 per unitLittle or no solar output in the evening; only partial output late in the morning slot
10:00 to 18:00 (daytime)Less Rs 0.50 per unitMost of a rooftop plant's daily output falls here
22:00 to 6:00 (night)Normal energy chargeNo solar output

Fuel and power purchase cost adjustments (FSA/FCA) and electricity duty are charged on top, as the schedule notes.

Who ToD applies to

The FY 2026-27 schedule lists these categories for ToD billing:

  • HT-I(A) Industry General and HT-I(A) Poultry Farms
  • HT-II(A) Others (commercial) and HT-II(B) Wholly Religious Places
  • HT-III Airports, Railway Stations and Bus Stations
  • HT-IX Electric Vehicle Charging Stations

LT categories, including LT industry and LT commercial, are not in the ToD list for this year. Nationally, the Electricity (Rights of Consumers) Amendment Rules, 2023 (announced by the Ministry of Power on 23 June 2023) asked states to apply ToD to commercial and industrial consumers with maximum demand of 10 kW and above from 1 April 2024, and to most other consumers by 1 April 2025, with ToD starting as soon as a smart meter is installed. Telangana decides any extension to LT in its own tariff orders.

Rooftop solar array on a packaging factory, installed by Greentek

What changed in the last year

Three decisions shape the 2026 picture:

  • Night rebate withdrawn: HT industrial consumers used to get a rebate of Rs 1.50 a unit at night. TGERC approved its withdrawal in an order dated 15 November 2025. After an APTEL remand, TGERC's order of 2 April 2026 refused to restore it (as reported by Mercom India and Power Peak Digest). Night-shift plants now pay the normal rate.
  • Peak and daytime figures for FY 2026-27: the tariff order for the year kept retail energy and fixed charges unchanged, and set the peak surcharge at Rs 1.50 and the 10:00 to 18:00 rebate at Rs 0.50, as per the schedule above.
  • A larger solar-hours discount is not here yet: the 2023 national rules say the tariff during eight solar hours set by the state commission should be 10% to 20% below the normal tariff, and peak tariffs 10% to 20% higher. A petitioner asked TGERC for a 20% solar-hour discount. In April 2026 TGERC said such a change would restructure the whole ToD system and can only be made through a full tariff proceeding with public consultation (SolarQuarter, 7 April 2026). Watch the next tariff filings.

What ToD means for a rooftop solar plant

Here is the part many proposals skip. Under ToD, the grid power that rooftop solar replaces during the day is already Rs 0.50 cheaper than the normal rate. So each solar unit you use on site between 10:00 and 18:00 saves the normal energy charge minus Rs 0.50, not the full normal rate. Solar still pays, but on its own it does nothing about the most expensive hours.

The bigger lever is the Rs 2.00 gap between the peak and daytime slots. Every unit of flexible load you move from the evening peak into the daytime window saves Rs 2.00 on the grid bill. If that load then runs on your own solar, you avoid the grid charge for it entirely. Solar and load shifting work best together: the plant makes daytime energy cheap, and the production schedule moves demand into the daytime.

For monthly output, see our kW vs units guide for Hyderabad.

A simple load-shifting check

Start with twelve months of HT bills and the meter's interval data if available, then list loads that need not run at a fixed time.

Load typeCan it move into 10:00 to 18:00?What to watch
Water pumping and storage tank fillingUsually yesTank capacity for the evening
Air compressors charging receiversPartlyReceiver size and pressure drop
Batch processes (mixing, drying, curing)OftenLabour shifts and quality
Chillers and cold rooms (pre-cooling)PartlyThermal storage and product limits
EV fleet or forklift chargingUsually yesVehicle availability
Continuous process linesRarelyNot worth disturbing

An illustration of the arithmetic: if a plant moves 500 units a day of pumping and batch load from 6 to 10 pm into the afternoon, the ToD saving is 500 x Rs 2.00 = Rs 1,000 a day, or about Rs 26,000 over 26 working days. Your own numbers will differ, and savings are always subject to site assessment.

One caution. Squeezing loads into fewer hours can push your recorded maximum demand above the contracted demand. The FY 2026-27 schedule bills demand charges on the excess at twice the normal rate, and raises energy charges further when the excess goes beyond 120%. Check your contracted demand before you stack loads into the afternoon.

Net metering, open access and batteries

HT consumers with rooftop plants under the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025 (in force from 15 November 2025) settle surplus energy monthly at the lowest solar tariff discovered in the previous financial year, as reported by Power Peak Digest. The public summaries we reviewed do not say how exports and imports are matched across ToD slots on a net-metered HT bill, so ask your DISCOM how your bill applies ToD before you count on exported units to offset peak imports. Our TGSPDCL net metering guide covers the process.

If your roof is too small, green energy open access can bring in solar from outside the site; see our open access guide for Telangana. A battery that stores midday solar for the evening peak can capture the Rs 2.00 gap, less its round-trip losses, but batteries attract 18% GST against 5% for solar devices, so the case needs a careful site-specific study.

Frequently asked questions

Does ToD apply to my LT factory in Telangana?

Not under the FY 2026-27 schedule, which lists only HT categories for ToD. Check the schedule each year, because the national rules push states to extend ToD to more consumers as smart meters arrive.

Is there still a night rebate for HT industry?

No. It was withdrawn by TGERC's order of 15 November 2025, and the commission declined to restore it in April 2026. The 10 pm to 6 am slot is billed at the normal energy charge.

Does ToD make rooftop solar less attractive?

Slightly, per unit, because daytime grid power is Rs 0.50 cheaper. But it makes the combination of solar and load shifting more valuable, because each unit moved out of the peak saves Rs 2.00 before solar is counted. Our CAPEX vs OPEX vs PPA guide explains how the ownership model changes the payback.

Rules can be revised. This guide is current as of November 2026; check the latest TGERC tariff order and your own bill before relying on it.

Want help reading your ToD bill?

Greentek has been designing and building solar plants for factories and businesses from Secunderabad since 1997. If you want a second look at how your load sits across the ToD slots and how much of it solar can carry, our team is happy to help.

About the Author
Satya

Expert insights from Greentek's experienced solar energy team.

About Greentek
28+Years in Industry
1.8+ GWExecution Scope
2Project Countries
25+Major Projects

Get a Free Solar Quote

A Greentek engineer will call you within 24 hours.

Need Solar Solutions?

Interested in learning more about our solar energy solutions? Get in touch with our experts.

Get Free Consultation